The community co-operative proposal would require significantly less blasting and site work would take about 1 year to complete when designed as follows:
First two draft tubes will be constructed under DR 169 to return the flow of water back into the river. This will require a brief closure of DR 169 with traffic being detoured on Bala Falls Road or Muskoka Road 38 (for large vehicles).
Upon Completion of the DR 169 work, construction will begin on the intake structure which will be completed in conjunction with replacement of the old Bala Falls Road bridge.
Here is an artist rendering of the proposed tailrace area of the Moon River.
Here is an artist rendering of the hydro facility and parking lot proposed by SREL
Here is a photo of the significantly smaller generator that existed on the site until 1972: